Has he the change? Or the change him?

January 12th, 2007

from moneyball …

” Lately in a wreck of a Californian ship, one of the passengers fastened a belt about him with two hundred pounds of gold in it, with which he was dound afterwards at the bottom. Now as he was sinking — had he got the gold or the gold him?

– John Ruskin, Unto his Last

VP of IT Operations at a Fortune 1000 company mentioned that the way he figures out whether there is going to be downtime after a change window is to look at the pattern of change events during a change window (using Solidcore). He says good change windows have the pattern of a lot of change in the begining and then nothing. Bad change windows have two peaks: a lot of change in the begining, then a lot of change in the end. I know at that point Has he the change? Or the change him?

Entry Filed under: Change Control, ITIL Humor

Leave a Comment

You must be logged in to post a comment.

Trackback this post  |  Subscribe to the comments via RSS Feed


Calendar

January 2007
M T W T F S S
« Dec   Feb »
1234567
891011121314
15161718192021
22232425262728
293031  

Most Recent Posts